Projects
|
|
|
|
|
No.’s |
Particulars |
Name of Client |
Location |
Duration |
Total Value |
|
|
|
|
|
|
|
1) |
Supply & Installation of FRP
Piping & Equipment Erection work |
Jotun India Pvt. Ltd. |
Ranjangaon - Pune |
Oct - 20, 2018 to April - 10, 2019 |
55 Lakh |
|
|
|
|
|
|
2) |
Supply & Fixing of GI Roof Gutter work |
PepsiCo India Holdings Pvt. Ltd. |
Nelamangla - Banglore |
Dec - 11, 2018 to May - 10, 2019
|
25 Lakh |
|
|
|
|
|
|
3) |
Supply & Fixing of RFP Roof Gutter work |
BASF India Ltd. |
Turbhe - Navi Mumbai |
April - 15, 2019 to May - 31, 2019 |
12 Lakh |
|
|
|
|
|
|
4) |
Fabrication, Installation of Structural Shed &
SS/MS Piping work |
IVP Ltd |
Tarapur - Boisar (MH) |
Feb - 10, 2018 to June - 10, 2019
|
322 Lakh |
|
|
|
|
|
|
5) |
Supply & Installation of Boiler Ducting Work. |
Jonson Mathey Chm. (I) Pvt. Ltd. |
Taloja - Maharashtra |
June - 01, 2019 to July - 15, 2019
|
81 Lakh |
|
|
|
|
|
|
6) |
Dismantling & Installation of
Equipment & Structure |
Saint-Gobain India Pvt Ltd. |
Wada - Maharashtra |
July - 03, 2019 to Oct - 15, 2019
|
48 Lakh |
|
|
|
|
|
|
7) |
Annual Maintenance for Equipment, Piping & Structure
& Shutdown Job |
Bhavnagar/Bhuj (Gujarat) |
Thane - Maharashtra |
Jan - 01, 2019 to December - 31, 2019
|
315 Lakh |
|
|
|
|
|
|
8) |
Annual Maintenance for Equipment,
Piping & Structure work |
UPL Ltd. |
Vapi (Gujarat) |
Jan - 01, 2019 to Dec - 31, 2019
|
75 Lakh |
|
|
|
|
|
|
9) |
Annual Maintenance for Equipment,
Piping & Structure work |
Inventys Research Company Pvt. Ltd. |
Butibori - Nagpur |
Jan - 01, 2019 to December - 31, 2019
|
60 Lakh |
|
|
No.’s |
Particulars |
Name of Client |
Location |
Duration |
Total Value |
|
|
|
|
|
|
|
1) |
Fabrication &
Erection of Piping, Structure & Equipment Erection work |
Pidilite Industries
|
Mahad Maharashtra |
March - 10, 2017 to Jan
- 15, 2018 |
92 Lacs |
|
|
|
|
|
|
2) |
Fabrication of SS / MS Tanks &
structure work |
AAK Kamani Oil |
Khopoli |
Oct - 01, 2017 to March - 15, 2018
|
62 Lacks |
|
|
|
|
|
|
3) |
Fabrication & Erection of
Structure work |
Excel Crop Care Ltd. |
Bhuj - Gujarat |
March - 01, 2017 to March - 31,
2018 |
95 Lacks |
|
|
|
|
|
|
4) |
Design, Drawing,
Supply, Fabrication of SS 304 - 50 KL Tank & Chimney Structure |
IVP Ltd |
Tarapur - Boisar (MH) |
April - 15, 2018 to Aug - 21, 2018
|
41 Lakh |
|
|
|
|
|
|
5) |
Fabrication of Storage Tanks with
piping & Structural platform work |
Jell Pharmaceutical Pvt. Ltd. |
Rabale - Maharashtra |
Sept - 01, 2017 to Aug - 31, 2018
|
65 Lakh |
|
|
|
|
|
|
6) |
Supply & Fabrication of 500
KL Storage tank |
BASF India Ltd. |
Dahej - Gujarat |
March - 20, 2018 to Sept - 05, 2018
|
88 Lakh |
|
|
|
|
|
|
7) |
Supply & Installation of Fire
Protection Systems work |
Envirocare Labs® Pvt Ltd |
Thane - Maharashtra |
April - 15, 2018 to Sept - 15, 2018
|
102 Lakh |
|
|
|
|
|
|
8) |
Supply, Fabrication & Installation of
Boiler Ducting Work. |
Jonson Mathey Chm. (I) Pvt. Ltd. |
Taloja - Maharashtra |
Aug - 01, 2018 to Dec - 10, 2018
|
35 Lakh |
|
|
|
|
|
|
9) |
Annual Maintenance for Equipment,
Piping & Structure & Insulation |
Excel Crop Care Ltd. |
Bhavnagar/Bhuj (Gujarat) |
Jan - 01, 2018 to December - 31, 2018
|
244 Lakh |
|
|
|
|
|
|
10) |
Annual Maintenance for Equipment,
Piping & Structure & Insulation |
UPL Ltd. |
Vapi (Gujarat) |
Jan - 01, 2018 to December - 31, 2018
|
122 Lakh |
|
|
No.’s |
Particulars |
Name of Client |
Location |
Duration |
Total Value |
|
|
|
|
|
|
|
1) |
Fabrication &
Installation of MS/SS Piping, Structure & Equipment work |
BASF Ltd. |
Turbhe – Navi Mumbai
(MH) |
Nov - 15, 2016 to April
- 20, 2017 |
65 Lacs |
|
|
|
|
|
|
2) |
Fabrication of MS Storage Tank –
3000 KL - 1 Nos |
IOCL |
Miraj - Solapur (MH) |
Feb - 15, 2017 to June - 30, 2017
|
22 Lacks |
|
|
|
|
|
|
3) |
Shop Fabrication, Galvanizing,
Transport & Erection of Structural work |
Excel Industries Ltd. |
Roha - Maharashtra |
Jan - 01, 2017 to Oct - 15, 2017
|
259 Lacks |
|
|
|
|
|
|
4) |
Supply, Fabrication &
Installation of Structural work |
UPL Ltd. |
Vapi - Gujrat |
Feb - 05, 2017 to Oct - 15, 2017
|
275 Lacks |
|
|
|
|
|
|
5) |
Design, Drawing, Supply,
Fabrication & Painting of MS Storage 12 Nos (220, 50 & 30 KL) |
IVP Ltd. |
Tarapur – Boisar (MH) |
March - 15, 2017 to Dec - 15, 2017
|
165 Lacks |
|
|
|
|
|
|
6) |
Supply & Fabrication of IBR
Piping with insulation & IBR Approval work |
IVP Ltd. |
Tarapur – Boisar (MH) |
Nov - 15, 2017 to Dec - 31, 2017
|
22 Lacks |
|
|
|
|
|
|
7) |
Annual Maintenance for Equipment,
Piping & Structure & Insulation |
Excel Crop Care Ltd. |
Bhavnagar/Bhuj (Gujarat) |
Jan - 01, 2017 to Dec - 31, 2017
|
225 Lacks |
|
|
|
|
|
|
8) |
Rental Charges of Equipments |
Ferrero India Pvt. Ltd. |
Baramati Maharashtra |
Jan - 01, 2017 to Dec - 31, 2017
|
56 Lacks |
|
|
|
|
|
|
9) |
Rental Charges of Equipments |
Hindustan Coco-Cola Beverages Pvt.
Ltd. |
Nashik Maharashtra |
Jan - 01, 2017 to Dec - 31, 2017
|
26 Lacks |
|
|
No.’s |
Particulars |
Name of Client |
Location |
Duration |
Total Value |
|
|
|
|
|
|
|
1) |
Fabrication of Storage
Tank |
Excel Industries Ltd.
|
Roha -
Maharashtra |
Oct - 15, 2015 to March
- 31, 2016 |
45 Lacs |
|
|
|
|
|
|
2) |
Supply, Fabrication, painting &
Erection of Structural steel |
Jonson Mathey Chm. (I) Pvt. Ltd.,
|
Taloja -
Maharashtra |
Feb - 01, 2016 to April
- 15, 2016 |
55 Lacks |
|
|
|
|
|
|
3) |
Fabrication & Installation of
IBR piping, CS/SS piping, Structure & Equipment work |
Pepsico India Holdings Pvt. Ltd.
|
Neelmangala –
Banglore |
Nov - 15, 2015 to April - 30, 2016
|
267 Lacks |
|
|
|
|
|
|
4) |
Fabrication & Installation of
FPS Piping |
L & T |
Tech Mahindra Banglore Karnataka
|
march - 01, 2015 to June - 30, 2016
|
65 Lacks |
|
|
|
|
|
|
5) |
Fabrication of Storage Tank |
Samay Project |
HPCL Terminal – Gandhinagar, Gujrat
|
Dec - 15, 2015 to Aug - 25, 2016
|
45 Lacks |
|
|
|
|
|
|
6) |
Fabrication & Installation of
Structural steel work. |
Sulzer Chemtech Tower Field
Services (I) Pvt. Ltd. |
RIL - Nagothane |
June - 03, 2016 to Oct - 15, 2016
|
35 Lacks |
|
|
|
|
|
|
7) |
Fabrication, painting &
Erection of 250 KL Styeren Storage Tank |
BASF Ltd. |
Dahej - Gujrat |
Sep - 01, 2016 to Oct - 16, 2016
|
33 Lacks |
|
|
|
|
|
|
8) |
Supply, Fabrication, painting,
Insulation & Erection of Fuel Gas Stack |
Jonson Mathey Chm. (I) Pvt. Ltd.
|
Taloja - Maharashtra |
June - 01, 2016 to Nov - 30, 2016
|
22 Lacks |
|
|
|
|
|
|
9) |
Annual Maintenance for Equipment,
Piping & Structure & Insulation |
Excel Crop Care Ltd. |
Bhavnagar/Bhuj (Gujarat) |
Jan - 01, 2016 to Dec - 31, 2016
|
195 Lacks |
|
|
|
|
|
|
10) |
Annual Maintenance for Equipment,
Piping & Structure & Insulation |
United Phosphorus Ltd. |
Vapi - Gujrat |
Jan - 01, 2016 to Dec - 31, 2016
|
80 Lacks |
|
|
|
|
|
|
11) |
Rental charges of Construction
equipment’s |
Ferrero India Private Limited |
Baramati - Maharashtra |
Jan - 01, 2015 to Dec - 31, 2016
|
150 Lacks |
|
|
|
|
|
|
12) |
Rental charges of material handling
equipment |
Coca Cola Beverages Pvt Ltd. |
Nasik |
Jan - 01, 2015 to Dec - 31, 2016
|
35 Lacks |
|
|
|
|
|
|
13) |
Rental Charges of material handling
equipment |
United spirit ltd |
Baramati |
Jan - 01, 2015 to Dec - 31, 2016
|
29.75 Lacks |
|
|
|
|
|
|
14) |
Annual Maintenance for Equipment,
Piping & Structure & Insulation |
Pidilite Industries Ltd. |
Mumbai - Maharashtra |
Jan - 01, 2016 to Dec - 31, 2016
|
30 Lacks |
|
|
|
|
|
|
15) |
Rental Charges of Equipments |
Ferrero India Pvt. Ltd. |
Baramati Maharashtra |
Jan - 01, 2016 to Dec - 31, 2016
|
252 Lacks |
|
|
|
|
|
|
16) |
Rental Charges of Equipments |
Hindustan Coco-Cola |
Gujarat / Maharashta |
Jan - 01, 2016 to Dec - 31, 2016
|
12 Lacks |
|
|
No.’s |
Particulars |
Name of Client |
Location |
Duration |
Total Value |
|
|
|
|
|
|
|
1) |
Installation of
Machinery & Fabrication & Erection of MS/SS Piping work |
The Paper Product
Ltd. |
Silvassa -
Gujarat |
March - 28, 2014
to
Feb - 28, 2015 |
133 Lacs |
|
|
|
|
|
|
2) |
shifting, loading, unloading
& reinstallation of ESP Structural steel work |
VT Crop Pvt. Ltd (Project of
Tata Power Ltd.) |
Mahul – Mumbai (Maharashtra)
|
April- 21, 2014
to March - 15, 2015 |
230 Lacks |
|
|
|
|
|
|
3) |
Dismantling, Transportation &
Re -installation of Equipment Fabrication & IBR/Non IBR CS/SS piping, Structure
work |
BASF Ltd. |
– Dahej, Gujarat |
Feb - 01, 2014 to Feb - 15,
2015 |
178 Lacks |
|
|
|
|
|
|
4) |
Fabrication of Storage Tank
|
Kamani OilIndustries Ltd.
|
Khopoli - Maharashtra |
Feb - 25, 2015 to July - 25,
2015 |
71.5 Lacks |
|
|
|
|
|
|
5) |
Fabrication of Storage Tank &
Stack work |
Jell Pharmaceutical Pvt. Ltd.
|
Silvassa - Gujarat |
March - 09, 2015 to July -
27, 2015 |
45 Lacks |
|
|
|
|
|
|
6) |
HAVC System (Cidco Projects
Dasmesh) |
National Fashion Technology
|
Kharghar Mumbai |
May - 01, 2015 to Sep - 30,
2015 |
34 Lacks |
|
|
|
|
|
|
7) |
B.O & W.O 24” Line
Dismantling & Fabrication shutdown work. |
IOT Infrastructure & Energy
Service Ltd. |
Navghar – Uran Maharashtra
|
Sep - 09, 2015 to Oct - 13,
2015 |
44 Lacks |
|
|
|
|
|
|
8) |
Annual Maintenance for
Equipment, Piping & Structure & Insulation |
Excel Crop Care Ltd. |
Bhavnagar / Bhuj (Gujarat)
|
Jan - 01, 2015 to Dec - 31,
2015 |
187 Lacks |
|
|
|
|
|
|
9) |
Fabrication & Installation of
Equipment, Stack, Piping, Structure & Insulation work |
United Phosphorus Ltd. |
Vapi - Gujrat |
Jan - 01, 2015 to Dec - 31,
2015 |
42 Lacks |
|
|
|
|
|
|
10) |
Rental Charges of Equipments
|
Ferrero India Pvt. Ltd. |
Baramati Maharashtra |
Jan - 01, 2015 to Dec - 31,
2015 |
227 Lacks |
|
|
|
|
|
|
11) |
Rental Charges of Equipments
|
Hindustan Coco-Cola Beverages
Pvt. Ltd. |
Nashik Maharashta |
Jan - 01, 2015 to Dec - 15,
2015 |
27 Lacks |
|
|
2014- Work
completed |
|
No.’s |
Particulars |
Name of Client |
Location |
Duration |
Total Value |
|
|
|
|
|
|
|
1) |
Installation &
Painting of Structural steel |
Proctor & Gamble
|
Hyderabad - AP |
Dec - 10, 2013 to Feb -
28, 2014 |
104 Lacs |
|
|
|
|
|
|
2) |
Dismantling, shifting, loading
& Transportation of Equipments & Structure work. |
Excel Crop Care Ltd. |
Roha (Maharashtra) |
June - 01 to 15 July
|
35 Lacks |
|
|
|
|
|
|
3) |
Dismantling, shifting, loading at
Panvel & Transport to Khopoli & Re-Installation of Equipments & Connected Piping &
Structure work |
Bohler-Uddeholm India Ltd. |
Panvel / Khopoli (Maharashtra) |
May - 01 to 31 July |
30 Lacks |
|
|
|
|
|
|
4) |
Fabrication & Installation of
IBR piping, CS/SS piping, Structure & Equipment installation work |
Chemithon Engineers Pvt. Ltd. |
C/o. BASF Ltd. – Dahej, Gujarat
|
May - 24, 2013 to Feb - 15, 2014
|
290 Lacks |
|
|
|
|
|
|
5) |
Annual Maintenance for Equipment,
Piping & Structure & Insulation work |
Excel Crop Care Ltd. |
Bhavnagar/Bhuj (Gujarat) |
Jan - 01, 2014 to Dec - 31, 2014
|
175 Lacks |
|
|
|
|
|
|
6) |
Rental Charges of Equipments |
Ferrero India Pvt. Ltd. |
Baramati, Maharashtra |
Jan - 01, 2014 to Dec - 31, 2014
|
172 Lacks |
|
|
|
|
|
|
7) |
Rental Charges of Equipments |
Hindustan Coco-Cola Beverages Pvt.
Ltd. |
Gujarat / Maharashta |
Jan - 01, 2014 to Dec - 31, 2014
|
23 Lacks |
|
|
|
|
|
|
|
2013- Work completed
|
|
No.’s |
Particulars |
Name of Client |
Location |
Duration |
Total Value |
|
|
|
|
|
|
|
1) |
Dismantling, Shifting
& Lowering of
machinery leaj line |
Simplot India
Pvt. Ltd. |
Vadanagar -
Gujarat |
Jan - 07 to Mar - 31 |
33 Lacs |
|
|
|
|
|
|
2) |
Fabrication &
Erection of Piping &
Installation of
Machinery |
Brilliant
Polymers |
Ambernath -
Maharashtra |
Nov - 16 to May - 28 |
120 Lacks |
|
|
|
|
|
|
|
3 |
Fabrication & Erection of Fire fighting
system work. |
L&T Project C/o. Cognizant Technology. |
Phase III Hinjewadi (Pune) |
1st Nov 2011 to 30th June |
149 Lacs |
|
|
|
|
|
|
4) |
Annual Maintenance
for Equipment,
Piping & Structure
& Insulation |
Excel Crop
Care Ltd. |
Bhavnagar/Bhuj
(Gujarat) |
1st Jan to 31st
December
2013 |
85 Lacks |
|
|
|
|
|
|
5) |
Fabrication &
Erection of IBR
Piping & Installation
of Machinery |
Pepsico India
Holdings Pvt.
Ltd. |
Channo -
Panjab |
15th April to 30th June
2013 |
46 Lacks |
|
|
|
|
|
|
6) |
Fabrication &
Erection of MS/SS
Piping & Installation
of Machinery |
Chemithon
Engineers
Pvt. Ltd. |
C/o. BASF Ltd.
Dahej,
Gujarat |
24th May
2013 - 30th Nov
2013 |
90 Lacks |
|
|
|
|
|
|
7) |
Fabrication &
Erection of Fire
fighting system work |
Emergency
Electronic
Security (I)
Pvt. Ltd. |
IIT Pawai
Project -
Mumbai |
1st May
2013 to 15th June
2013 |
15 Lacks |
|
|
|
|
|
|
8) |
LDR Survey |
HCPL |
Mahul -
Mumbai |
15th Feb
2013 to 30st Nov
2013 |
14.88 Lacks |
|
|
|
|
|
|
|
|
|
No.’s |
Particulars |
Name of Client |
Location |
Duration |
Total Value |
|
|
|
|
|
|
|
1) |
Fabrication & Erection of PEB Structural &
Equipment at site |
Transweigh India Pvt. Ltd |
Jambusar(Gujarat) |
Nov - 15 to Feb - 15 |
22 Lacs |
|
|
|
|
|
|
2) |
Fabrication & Erection of Storage Tanks, connected Piping &
Fixing of Roof & side cladding |
Jell Pharmaciuticals Pvt. Ltd. |
Bharuch (Gujarat) |
Sep - 15 to Mar - 15 |
45 Lacks |
|
|
|
|
|
|
3) |
Fabrication & Erection of Piping structural, Painting &
Equip. site Fabrication |
Expanded Incorporation |
Bharuch (Gujarat) |
Oct1 - 15 to Mar - 29 |
58 Lacks |
|
|
|
|
|
|
4) |
Installation of PC 10 Line |
ITC Ltd. Food - Div. |
Ranjangaon (Maharashtra) |
Apr - 20 to May - 15 |
11.5Lacks |
|
|
|
|
|
|
5) |
Fabrication & Erection of Piping structural, Painting &
Equip. site Fabrication |
Expanded Incorporation |
LG (Pune) |
May - 1 to Jun - 5 |
11.5Lacks |
|
|
|
|
|
|
6) |
Fabrication & Erection of Piping & Installation of
Machinery |
Pepsico India Holdings Pvt. Ltd., (Frito-Lay Div.) |
Channo (Panjab) |
Apr - 1 to Jun - 10 |
46.5Lacks |
|
|
|
|
|
|
7) |
Installation of structural steel Platform & Equipment work
|
Symtech India Ltd. |
Taloja, (Maharashtra) |
jun - 15 to July - 21 |
12.5Lacks |
|
|
|
|
|
|
8) |
Fabrication & Erection of Fire fighting system work. |
Laxmi Organic Industries Ltd. |
Mahad (Raigad-MH) |
Apr - 30 to Jul - 31 |
14.5Lacks |
|
|
|
|
|
|
9) |
Fabrication, Painting & Sand blasting of structural steel,
Piping & Equipment Erection |
BASF India Ltd. |
Manglore (Karnataka) |
Apr - 1 to Aug - 15 |
42.5Lacks |
|
|
|
|
|
|
10) |
IBR Piping
fabrication & lisening
approval work |
Pepsico (I) Holdings Pvt. Ltd. Cold - Div. |
Neelmangala - Banglore |
May - 15 to Sep - 15 |
34 Lacks |
|
|
|
|
|
|
11) |
Fabrication of MS
Tanks, connected
piping structural steel
& Painting, etc. |
Gelnova
Laboratories
(India) Pvt. Ltd. |
MIDC Pawne
Navi
Mumbai |
Aug - 10 to Sep - 20 |
10.26 Lacks |
|
|
|
|
|
|
12) |
Annual Maintenance
for Equipment, Piping
& Structure &
Insulation |
Excel Crop
Care Ltd. |
Bhavnagar
(Gujarat) |
Jan - 1 to Dec - 31 |
54 Lacks |
|
|
|
|
|
|
13) |
Annual Maintenance
for Equipment, Piping
& Structure &
Insulation; |
Excel Crop
Care Ltd. |
Bhuj
(Gujarat) |
Jan - 1 to Dec - 31 |
30 Lacks |
|
|
|
No.’s |
Particulars |
Name of Client |
Location |
Duration |
Total Value |
|
|
|
|
|
|
|
1 |
Fabrication & Erection of Polyurethane
Project, Piping & Equipment insulation & Painting. |
Expanded Incorporation |
Ranjangaon (Pune) |
Oct - 25 to Jan - 5 |
6 lacs. |
|
|
|
|
|
|
2 |
Equipment Erection, PEB Structure, SS/MS
Piping, Tharmal Insulation & Painting. |
ITC Ltd. Food - Div. |
Ranjangaon (Maharashtra) |
Oct - 21 to Jan - 11 |
38.9 lacs. |
3 |
Fabrication of Farnance & Firefighting
piping. |
Jaybee Steel |
Ambernath (MH) |
July - 1 to Jan - 21 |
11.5 lacs |
|
|
|
|
|
|
4 |
Supply Fabrication & Erection of
Polyurethane Project, Piping & Equipment insulation & Painting. |
Perfetti Van Melle Pvt. Ltd. |
Chennai |
Nov - 25 to Jan - 25 |
10.5 lacs. |
|
|
|
|
|
|
5 |
Fabrication of structural steel, Equipment
Erection, MS,SS Piping. |
Proctor & Gamble |
Mandideep (Bhopal) |
Jan - 1 to Feb - 30 |
6.95 lacs |
|
|
|
|
|
|
6 |
Fabrication of MS/SS piping and structural
steel & Equipment Erection etc. |
Mazda Ltd. |
Sterlite - Silvassa |
Jan - 15 to Mar - 30 |
10.25 lacs |
|
|
|
|
|
|
7 |
Fabrication of Monorail & working platform
etc. |
Pepsico (I) Holdings Pvt. Ltd. Cold. Div. |
Mahul - Mumbai |
Nov - 25 to Mar - 31 |
40 lacs |
|
|
|
|
|
|
8 |
Fabrication, Painting & Sand blasting of
structural steel, Piping & Equipment Erection RND Lab. |
BASF India Ltd. |
Manglore
(Karnataka) |
Oct - 31 to May - 15 |
77.5 lacs. |
|
|
|
|
|
|
9 |
Fabrication of MS Tanks, connected piping
structural steel & Painting, etc. |
Pepsico (I) Holdings Pvt. Ltd. Cold - Div. |
Neelmangala - Banglore |
Nov - 14 to May - 31 |
124 lacs |
|
|
|
|
|
|
10 |
Mechanical Installation work |
Pepsico Fritolay –Div. |
Kolkata West Bengal |
Mar - 1 to May - 31 |
40.67 lacs. |
|
|
|
|
|
|
11 |
Fabrication & Erection of Polyurethane
Project, Plant, structural, Sand blasting, Painting & Equip. site Fabrication |
Expanded Incorporation |
Dahej ( Gujrat ) |
Mar - 21 to Jun - 30 |
76 lacs. |
|
|
|
|
|
|
12 |
Fabrication & Erection of Pipe rack, structural, Sand
blasting, Painting & IBR Piping. |
Pepsico (I) Holdings Pvt. Ltd. Fritolay - Div. |
Ranjangaon ( Pune ) |
Mar - 31 to Oct - 20 |
89.5 lacs. |
|
|
|
|
|
|
13 |
Fabrication & Erection of PEB Structural & Equipment at
site. |
Saint-Gobain Gyproc India Pvt. Ltd. |
Wada (Thane) |
Jun - 1 to Oct - 30 |
38.15 lacs. |
|
|
|
|
|
|
14 |
Fabrication & Erection of Structural & Equipment. |
Pidilite Industries Ltd. |
Mahad (Raigad) |
May - 20 to Dec - 15 |
26.5 lacs. |
|
|
|
|
|
|
15 |
Installation of Equipments & Machineries & SS Ducting work.
|
Proctor & Gamble |
Mandideep (Bhopal) |
Sep - 1 to Nov - 30 |
23.5 lacs. |
|
|
|
|
|
|
16 |
Annual Maintenance for Equipment, Piping & Structure &
Insulation |
Excel Crop Care Ltd. |
Bhavnagar (Gujarat) |
Jan 1 to Dec - 31 |
55 lacs. |
|
|
|
|
|
|
17 |
Fabrication of 150 KL Storage Tanks in SS 304 Material.
|
Jindal Drugs Ltd. |
Taloja (Maharashtra) |
Jan - 1 to Dec - 31 |
36 lacs. |
|
|
|
No.’s |
Particulars |
Name of Client |
Location |
Duration |
Total Value |
|
|
|
|
|
|
|
1 |
Equipment Hiring for Loading & Unloading.
|
Hindustan Coca-Cola Beverages Pvt. Ltd. |
Wada( Bhivandi ) Kheda (Gujarat) |
Nov - 9 to Mar - 10 |
44 lacs
17 lacs |
|
|
|
|
|
|
2 |
Dismantling of Equipment, Connected Piping,
Structural Steel, etc. |
Clariant Chemicals (India) Ltd. |
Thane (Maharashtra) |
Jan - 10 to Apr - 10 |
56 lacs. |
|
|
|
|
|
|
3 |
Fabrication of MS Tanks, connected piping and
structural steel, etc. |
Laxmi Organic Industries Ltd. |
Raigad (Maharashtra) |
jan - 10 to Jul - 10 |
85 lacs. |
|
|
|
|
|
|
4 |
Fabrication of structural steel, Equipment
Erection, MS,SS Piping. |
Basf Costruction Chemical Ltd. |
Mangalore
(Karnataka) |
Jan - 10 to Mar - 10 |
26 lacs. |
|
|
|
|
|
|
5 |
Fabrication of structural steel, Equipment
Erection, MS,SS Piping, |
Proctor & Gamble |
Mandideep (Bhopal) |
Jan - 10 to june - 10 |
55 lacs |
|
|
|
|
|
|
6 |
Annual Maintenance for Equipment, Piping &
Structure & Insulation |
Excel Crop Care Ltd. |
Bhavnagar (Gujarat) |
Jan - 10 to Dec - 10 |
44 lacs. |
|
|
|
|
|
|
7 |
Fabrication & Erection of Polyurethane
Project, Piping & Equipment insulation & Painting. |
Expanded Incorporation |
Gurgaon Hariyana |
Apr - 10 to May - 10 |
21 lacs. |
|
|
|
|
|
|
8 |
Fabrication of Structural steel, Equipment
Erection, MS,SS Piping, Painting & Insulation. |
Pepsico India Holdings Pvt. Ltd. Fritolay –Div.
|
Kolkata West Bengal |
Apr - 10 to jun - 10 |
41.85 lacs. |
|
|
|
|
|
|
9 |
Fabrication of structural steel, Equipment
Erection, MS,SS Piping,. |
Excel Crop Care Ltd. |
Bhuj (Gujrat ) |
Aug - 10 to Sep - 10 |
12.30 lacs. |
|
|
|
|
|
|
10 |
Installation of equipment, Fabrication of
connected piping and structural steel, etc. |
Aditya Birla Science & Technology company
Ltd. |
Taloja MIDC (Tal-Panvel Dist-Raigad) |
Jul - 10 to Sep - 10 |
23 lacs. |
|
|
|
|
|
|
11 |
Fabrication of structural steel, Equipment
Erection & MS,SS Piping,. |
Perfetti Van Melle Pvt. Ltd. |
Gudgaon ( Delhi ) |
Aug - 10 to Oct - 10 |
38.5 lacs. |
|
|
|
No.’s |
Particulars |
Name of Client |
Location |
Duration |
Total Value |
|
|
|
|
|
|
|
1 |
Fabrication of Firefighting piping &
structural Steel work. (Shutdown project) |
Excel Industries |
Bhavnagar
(Gujarat) |
April - 08 to Mar -09 |
49 lacs. |
|
|
|
|
|
|
2 |
Fabrication of Firefighting Piping, structural
steel, & Equipment Erection and connected piping, etc. |
Kamani Oil Industries Pvt. Ltd. |
Khopoli
(Raigad) |
Nov - 08 to May - 09 |
104 lacs. |
|
|
|
|
|
|
3 |
Fabrication of structural steel, Equipment
Erection, MS,SS Piping, Painting & Insulation. |
Pepsico India Holdings Pvt.Ltd. |
Mahul
(Mumbai) |
Nov - 08 to Dec - 09 |
80 lacs. |
|
|
|
|
|
|
4 |
Fabrication of structural steel, Equipment
Erection, MS,SS Piping, Painting & Insulation. |
Expanded Polymer System Pvt.Ltd. |
Dahej
(Gujarat) |
Feb - 09 to June - 09 |
24 lacs. |
|
|
|
|
|
|
5 |
Fugitive Emissions Survey |
Bharat Petrolium Corporation Ltd. |
Mahul
(Mumbai) |
Jan - 09 - to Mar - 09 |
2.86 lacs. |
|
|
|
|
|
|
6 |
Fabrication MS,SS Piping structural Steel
(Shutdown project) |
ITC Ltd. |
Ranjangaon
(Maharashtra) |
July - 09 to Dec - 09 |
75 lacs. |
|
|
|
|
|
|
7 |
Fabrication of structural steel, Equipment
Erection, MS,SS Piping. |
Basf India Ltd. |
Mangalore
(Karnataka) |
July - 09 to Nov - 09 |
70 lacs. |
|
|
|
|
|
|
8 |
Fabrication & Erection of structural
steel, SS Tanks, Piping, Painting & Insulation. |
Pepsico India holding, Food Div. |
Kolkatta |
July - 09 to Dec - 09 |
109 lacs. |
|
|
|
No.’s |
Particulars |
Name of Client |
Location |
Duration |
Total Value |
|
|
|
|
|
|
|
1 |
Fabrication MS,SS Piping structural Steel (Shutdown project)
|
Excel Industries |
Bhavnagar (Gujarat) |
April - 07 to Mar - 08 |
55 lacs. |
|
|
|
|
|
|
2 |
Piping Equipment Erection |
Expanded Incorporation |
Bharuch |
June - 07 to Mar - 08 |
10 lacs. |
|
|
|
|
|
|
3 |
Structural steel & Piping equipment erection |
BASF Ltd |
Turbhe( Navi Mumbai ) |
Nov - 07 to Feb - 08 |
35 lacs. |
|
|
|
|
|
|
4 |
Piping, structur0g & insulation |
Pepsico India holding Ltd., colddrink div. |
Mahul , Mumbai-74 |
Nov - 07 to Apr - 08 |
61 lacs |
|
|
|
|
|
|
5 |
Structural Steel |
ITC Ltd. |
Rangengaon, Pune |
Nov - 07 to june - 08 |
50 lacs. |
|
|
|
|
|
|
6 |
Structural steel & Piping equipment erection |
Pepsico India hilding, Food div. |
Rangengaon, Pune |
Mar - 08 to Sept - 08 |
69.5 Lacs |
|
|
|
|
|
|
7 |
Piping project |
Cipla ltd. |
Kurkumbh |
June - 08 to Aug - 08 |
18 lacs |
|
|
|
|
|
|
8 |
Equipment erection, structural,fabrication
Piping.,electrical condut & Cable tray. |
ITC (FOOD DIVISION) |
Rangengaon
Pune |
Apr - 08 to Sept - 08 |
39 lacs |
|
|
|
|
|
|
9 |
Shutdown piping & Insulation |
Expanded Incorporation |
Noida,new Delhi |
June - 08 to july - 08 |
3.5 lacs |
|
|
|
|
|
|
10 |
Fugitive Emissions Survey |
Bharat Petrolium Corporation Ltd. |
Mahul (Mumbai) |
Apr - 07 to Mar - 08 |
2.86 lacs |
|
|
|
No.’s |
Particulars |
Name of Client |
Location |
Duration |
Total Value |
|
|
|
|
|
|
|
1 |
Equipment erection & piping |
Wipro ltd,(Milindia) |
Baddi |
Aug - 06 to Mar - 07 |
51 Lacs |
|
|
|
|
|
|
2 |
SS Storage Tanks fabrication & erection
with connected Piping |
Mc cain foods,India ltd. |
Mehsana -Ahmadabad |
Aug - 06 to July - 07 |
97 Lacs |
|
|
|
|
|
|
3 |
Equipment erection, piping |
Hindustan Lever (Millindia) |
Barotewala, Himachal |
Jan - 07 to Aug - 07 |
58 Lacs |
|
|
|
|
|
|
4 |
Erection & piping |
Pepsico India Holding (Cold) |
Mahul, Mumbai |
Jan - 07 to Mar - 07 |
45 Lacs |
|
|
|
|
|
|
5 |
Equipment, piping, structure |
Megafine farma |
Dindori-Nasik |
Feb - 06 to Jan - 07 |
45 Lacs |
|
|
|
|
|
|
6 |
Equipment Erection Alignments |
Accumax pvt. Ltd. |
Turbhe |
July - 07 to Aug - 07 |
9.5 lacs. |
|
|
|
|
|
|
7 |
Equipment erection & piping |
Chemex India pvt. Ltd. |
Baddi-Himachal |
Jan - 07 to July - 07 |
43 lacs |
|
|
|
No.’s |
Particulars |
Name of Client |
Location |
Duration |
Total Value |
|
|
|
|
|
|
|
1 |
Storage Tank |
Samay Project |
HPCL Terminal |
Sep - 10 2015
to Nov - 30 2015 |
45 Lacs |
|
|
|
|
|
|
2 |
Fabrication & Installation of IBR piping,
CS/SS piping, Structure & Equipment installation work |
ZCL Chemical Ltd. |
Ankleshwar - Gujarat |
|
250 Lacs |
|
|
|
|
|
|
|
|
|